How many houses can I build on my section in Auckland?

Updated 10 November 2026 · Auckland Unitary Plan

The short answer: it depends on your zone, then on whether the homes physically fit within the rules for height, coverage and boundaries. Here's how to work it out.

Step 1: the zone sets the starting number

Single House (H3): one home, plus a granny flat of up to 70m² under the national rules. More than one main home needs consent and isn't usually expected.

Mixed Housing Suburban (H4) and Mixed Housing Urban (H5): up to three homes without resource consent for the number of homes, if they meet the zone standards. Four or more need resource consent.

Terrace Housing and Apartment Buildings (H6): every new home needs resource consent, but the zone is set up for higher numbers.

Step 2: check what physically fits

Site coverage caps the ground floor: 40% of the site in H4, 45% in H5 and 50% in H6. Impervious surfaces (roofs plus driveways and paving) are capped at 60% in H4 and H5 and 70% in H6, which often limits parking and driveways more than the buildings do.

Height limits and recession planes then shape how many floors you get near each boundary. Narrow or odd-shaped sites lose more floor area to these rules.

Step 3: check the title and the site

Cross leases and unit titles usually need the other owners' agreement. Slope, stormwater pipes, flood areas and protected trees can all reduce what's realistic. A surveyor and planner confirm the final answer.

See it for your own site

Type an Auckland address to get the zone, overlays, title type, 3D building envelope, homes that could fit and a land value estimate — free.

Check an address →

Common questions

Can I build 3 houses without resource consent in Auckland?+

In the Mixed Housing Suburban (H4) and Mixed Housing Urban (H5) zones, up to three homes are permitted without consent for the number of homes, provided the development meets the zone's standards. Other consents, such as building consent, are still needed.

Do I need resource consent for a granny flat?+

Since 15 January 2026, a detached minor unit of up to 70m² can be built without resource consent if it meets the national standards. Building consent is usually still needed.

More guides

Looking at a particular area? Browse Auckland suburbs.

General information only — not planning, legal or valuation advice. Rules change; check the Auckland Unitary Plan or ask a planner for your site.